
A full-building repositioning and workplace fit-out on Manhattan's West Side, converting a dated commercial floorplate into a broadcast-ready headquarters with studio infrastructure.
Sidewalk-shed permitting, night-only crane picks, and continuous tenant operations on two floors shaped every logistics decision. Deliveries were scheduled in fifteen-minute windows across a single loading bay.
A 4D logistics model coordinated hoist runs, material staging, and studio commissioning. Acoustic performance was verified floor by floor before finishes were released.
