Bayfront Civic Terminal
Infrastructure · Tampa, FL · 2024

Bayfront Civic Terminal

Size
94,000 sq ft
Duration
19 months
Delivery
Design-Build
Client
Bayfront Port Authority
Overview

A waterfront passenger terminal and civic pavilion serving ferry and excursion traffic, built on a rehabilitated pier structure with a tensile canopy.

Scope of work
01
  • ·Tensile fabric canopy over the boarding concourse
  • ·Pier substructure rehabilitation and new marine piles
  • ·Ticketing hall, customs area, and public waterfront deck
  • ·Storm-hardened electrical and standby power
Challenges & solutions
02

Marine work windows were limited by manatee protection seasons and hurricane readiness requirements, compressing pile driving into two narrow periods.

Construction process
03

Canopy fabric was pre-assembled and tensioned on shore, then lifted in four sections during a single low-wind week.

Gallery — Bayfront Civic Terminal
Bayfront Civic Terminal — Infrastructure project in Tampa, FL