
A research and teaching building on a dense urban campus, pairing translational research labs with maker studios and a public-facing ground floor.
The site was bounded on three sides by occupied academic buildings and a city street with active transit. Crane placement and utility shutdowns were coordinated semester by semester.
Early trade partner involvement locked the envelope package before design completion, protecting the schedule against a volatile masonry market.
